The start-up procedure includes actions which need to be performed only when the
drive is powered up for the first time (eg, entering the motor data). After the first start
up, the drive can be powered up without using these start-up functions. The start-up
procedure can be repeated later if start-up data needs to be changed.
In addition to the PC tool commissioning and drive power-up, the start-up procedure
includes the following steps:
• entering the motor data and performing the motor identification run
• setting up the encoder/resolver communication
• checking the emergency stop and Safe Torque Off circuits
• setting up the voltage control
• setting the drive limits
• setting up the motor overtemperature protection
• tuning the speed controller
• setting up the fieldbus control.
This product is designed to be connected to and to communicate information and
data via a network interface. It is Customer's sole responsibility to provide and
continuously ensure a secure connection between the product and Customer
network or any other network (as the case may be). Customer shall establish and
maintain any appropriate measures (such as but not limited to the installation of
firewalls, application of authentication measures, encryption of data, installation of
anti-virus programs, etc) to protect the product, the network, its system and the
interface against any kind of security breaches, unauthorized access, interference,
intrusion, leakage and/or theft of data or information. ABB and its affiliates are not
liable for damages and/or losses related to such security breaches, any
unauthorized access, interference, intrusion, leakage and/or theft of data or information.
User name | Member Level | Quantity | Specification | Purchase Date |
---|
wechat/whatsapp:
+86-181-4410-0983
Email: kongjiangauto@163.com
Copyright © 2009 - 2024 Cld , All Rights Reserved K-JIANG All rights reserved