The goal of this course is to learn the process of evolving from HR to SDe series system.
Learning objectives
Upon completion of this course, the participants
will be able to: – Refresh on Harmony Rack architecture.
– Recognize the SDe system architecture and function of the different components.
– Establish PN800 Network Communications.
– Replace old HR to SDe Controllers.
– Upgrade project from HR controller to SDe controller.
– Setup different communication protocols with SDe controller after migration.
– Configure SDe Series I/O Modules.
– Maintenance and system Diagnostics
Participant Profile
This training is targeted to system and application engineers, commissioning and
maintenance personnel, service engineers and system integrators.
Prerequisites
Students should have basic knowledge of Windows 10. Windows Server 2019. and Office
2016/2019. They should also have attended the course M202 or S301 or S312. S336. S341 S+
classes, 800xA Harmony connect T321 have a basic knowledge about the fundamentals of
Process Control Systems.
Topics
– Course overview
– System Overview and Introduction
– Hardware: SDe Controller, I/Os, evolution chassis, features
– S+ Engineering Network, PN800 and Infinet differences
– Application engineering Prerequisites, conversion tool
– HMI Connectivity, Tag list updates
– Connectivity engineering
– Maintenance and Diagnostics
Course type and methods
This is an instructor led course with interactive classroom discussions and associated lab exercises.
Approximately 40% of the course is hands-on lab activities.
wechat/whatsapp:
+86-181-4410-0983
Email: kongjiangauto@163.com
Copyright © 2009 - 2024 Cld , All Rights Reserved K-JIANG All rights reserved