When investing in a pumped storage power plant, decision
makers identify and define the main requirements the plant
has to fulfill. Reasons may vary, for example with the main
drivers being to produce power from water as a renewable
energy source, to balance the grid or to build a large-scale
energy storage system to help manage the power grid
and security of supply. Investors and decision-makers need
to identify the best technology suitable to meet the project’s
specific purpose.
The PSPP Goldisthal is located in Thüringen (in the east-
southern region of Germany) and has a capacity of 1060MW.
The project has begun in 1997 and produced energy since
2003. There are two variable speed machine sets with
AC-excitation and asynchronous machine and two fixed
speed machine sets with start-up frequency converter and
synchronous machines.
Goldisthal is one of the first pumped storage power plants
where the decision was taken to use the variable speed
technology to improve operation behaviors and increase the
advantages in regard of efficiency in full load and especially
the significant improvement in part load operation.
User name | Member Level | Quantity | Specification | Purchase Date |
---|
wechat/whatsapp:
+86-181-4410-0983
Email: kongjiangauto@163.com
Copyright © 2009 - 2024 Cld , All Rights Reserved K-JIANG All rights reserved