The PSPP Goldisthal is located in Thüringen (in the east-
southern region of Germany) and has a capacity of 1060MW.
The project has begun in 1997 and produced energy since
2003. There are two variable speed machine sets with
AC-excitation and asynchronous machine and two fixed
speed machine sets with start-up frequency converter and
synchronous machines.
Goldisthal is one of the first pumped storage power plants
where the decision was taken to use the variable speed
technology to improve operation behaviors and increase the
advantages in regard of efficiency in full load and especially
the significant improvement in part load operation.
An SFC provides multiple features, including independent reactive power control for both grids
and the capability to supply the railway from a weak three-phase grid with low short circuit
power, ensuring perfect voltage balancing between phases.
It synchronizes the SFC along the line using the Phasor Management Unit (PMU), such as the
GE Vernova Multilin N60. which assists in balancing power across substations. The system is
protected by protection and control relays like the GE Vernova Multilin Agile. Additionally, it
supervises and manages the entire traction power supply to optimize availability. Faults along the
line are located using Travel Wave Form Localization (TWFL) technology, enabling faster recovery
of line supply.
User name | Member Level | Quantity | Specification | Purchase Date |
---|
wechat/whatsapp:
+86-181-4410-0983
Email: kongjiangauto@163.com
Copyright © 2009 - 2024 Cld , All Rights Reserved K-JIANG All rights reserved