Input Power Wiring
MicroNet controls require a fixed wiring installation for ac applications. Ground leakage exceeds 3.5 mA
AC. Maximum ground leakage for ac installations is 7.2 mA at 60 Hz. A ground conductor connected to
the chassis is required for safety. The power supply grounding terminal(s) should also be connected to
earth to ensure grounding of the power supply printed circuit boards. The grounding conductor must be
the same size as the main supply conductors.
Branch circuit fuses, circuit breakers, and wiring must meet appropriate codes and authorities having
jurisdiction for the specific country (CE, UL, etc.). See Table 4-4 for maximum recommended fuse or
breaker ratings. Do not connect more than one main power supply to any one fuse or circuit breaker. Use
only the wire sizes specified in Table 4-4 which meet local code requirements. Time delay fuses or circuit
breakers must be used to prevent nuisance trips.

The overspeed test function is activated when the key switch is in the
PROGRAM position and the operator presses and holds the OVSP TEST button
on the touch pad. The microcontroller switches the source of the MPU signal
from the MPU input to an on-board oscillator. The test speed is annunciated on
the LCD. If the test speed is adjusted above the trip setpoint, using the Test
Frequency potentiometer on each unit, a trip occurs. MPU loss-of-signal
checking is disabled, and the peak speed value does not change during
overspeed test. When the OVSP TEST button is released, the microcontroller
switches the source of the MPU signal back to MPU input and normal operation
is restored. Each ProTech unit must be reset to clear its trip condition.