I/O Module to Termination Unit Cable Manufacturers ABB
Bailey Model(s) ABB Bailey Infi 90 and Net 90, ABB Bailey Net 90
Information I/O Module to Termination Unit Cable, NKTU11-8, Connects I/O Module to Termination Unit, 8 feet long, non-PVC
Estimated Shipping Size Dimensions: 17.0" x 3.0" x 17.0" (43.2 cm x 7.6 cm x 43.2 cm)
Weight: 3 lbs 0.0 oz (1.4kg )
I/O Module to Termination Unit Cable
Introduction
Harmony tag objects are configured from the TagConfig Aspect in the Control
Structure inside the Workplace. This section describes the common aspect views of
the Harmony objects.
TagConfig Aspect View
All TagConfig Aspect views have the same general appearance and behavior. The
aspect views are divided into three common areas of Tabs, Body, and Footer.
Tabs
The tabs associated with the Aspect view depend on the type of object that is
selected for Harmony. Harmony data that is common to multiple object types is
presented in the same way to help make Harmony tasks easier and to improve
efficiency. The General tab is included for every object type.
Body
The body area contains all of the configurable properties of any selected tab.
Footer
The footer area contains controls to apply or cancel changes.
Sending Global Alarm Acknowledgement Messages to the Loop
Enable Tag Acknowledgment Broadcast
To broadcast an alarm acknowledgement for a specific Harmony tag:
– Select the Tag Acknowledgment Broadcast Enable check box on the Harmony Tab of the tag. Selecting the
checkbox enables the connectivity server to broadcast the alarm acknowledgement for this tag on the communication highway.
Enable Acknowledgment Transmission
Configure the module status tag for each node to which the connectivity server transmits the alarm acknowledgment messages.
For each module status tag, on the Module tab, select the Enable Alarm Acknowledgment
Transmission check box to have the connectivity server transmit any recently acknowledged alarms.
Broadcasts will only be sent to a node when the corresponding module status tag is configured and has alarm acknowledgment transmission enabled.
Receiving Global Alarm Acknowledgement from the Loop
Configure the Harmony Server tag to enable receiving global alarm acknowledgment messages from other nodes on the loop.
On the Harmony tab, select the Global Alarm Acknowledgement check box to
enable the connectivity server to process the Global Alarm Acknowledgement messages received through the INFI-NET loop.
The connectivity server applies the alarm acknowledgement to the harmony tag that has the same Harmony address as the broadcast tag.
User name | Member Level | Quantity | Specification | Purchase Date |
---|
wechat/whatsapp:
+86-181-4410-0983
Email: kongjiangauto@163.com
Copyright © 2009 - 2024 Cld , All Rights Reserved K-JIANG All rights reserved