ADJUSTMENTS
The Woodward Hand Held Programmer makes all
adjustments quickly and easily, through the control’s ten
convenient “menus”. The control saves all set points in
permanent memory, which does not require batteries or
other power sources to retain data. The Hand Held
Programmer prevents tampering with set points, yet allows
entries to be changed at any time.
• Menu 1 – Synchronizer Functions
• Menu 2 – Load Control Functions
• Menu 3 – Process Control Functions
• Menu 4 – VAR/Power Factor Control Functions
• Menu 5 – Configuration
• Menu 6 – Calibration
• Menu 7 – Generator Electric Parameters
• Menu 8 – Control Status Monitor
• Menu 9 – Discrete Inputs/Outputs Monitor
• Menu 0 – Diagnostics
SPECIFICATIONS
EENNVVIIRROONNMMEENNTTAALL
SSPPEECCIIFFIICCAATTIIOONNSS
Operating Temperature................................................-40 to +70 °C (-40 to +158°F)
Storage Temperature....................................................-55 to +105 °C (-67 to +221°F)
Humidity........................................................................95% at 38 °C
Electromagnetic Susceptibility......................................ANSI/IEEE C37.90.2; ANSI C37.90.1-1989
Mechanical Shock........................................................US MIL-STD 810C, Method 516.2. Procedures I, II, V
Vibration........................................................................US MIL-STD 167. Type I
EELLEECCTTRRIICCAALL
SSPPEECCIIFFIICCAATTIIOONNSS
CCoonnttrrooll
PPoowweerr
SSuuppppllyy
IInnppuutt
Operating......................................................................8–32 Vdc continuous (as low as 10 Vdc, 1.8 A max, or as high
as 77 Vdc for up to 5 min)
Reverse..........................................................................-56 Vdc continuous
Burden..........................................................................18 W, 1 A max.
VVoollttaaggee
SSeennssiinngg
IInnppuuttss
VVoollttaaggee::
120 Vac Input (L-N) Wye PT Configuration....................65–150 Vac, terminals 4-5. 7–12. 9 –12. and 11–12
240 Vac Input (L-N) Wye PT Configuration....................150–300 Vac, terminals 3-5. 6–12. 8–12. and 10–12
120 Vac Open Delta PT Configuration..........................65–150 Vac, terminals 3-5. 6–8. 8–10 and 10–6
240 Vac Open Delta PT Configuration..........................150–300 Vac, terminals 3-5. 6–8. 8–10. and 10–6
Phases ..........................................................................Three phase generator bus, single phase parallel bus
Frequency ....................................................................45–66 Hz
Burden..........................................................................Less than 0.1 VA per phase
Accuracy......................................................................0.1% of full scale
CCuurrrreenntt
IInnppuuttss
Current..........................................................................0–5 A rms
Frequency ....................................................................45 to 66 Hz
Burden..........................................................................Less than 0.1 VA per phase
Accuracy......................................................................0.1% of full scale
Phases ..........................................................................Three phase generator bus
Discrete Inputs ..............................................................18–40 Vdc @ 10 mA
Relay Driver Outputs......................................................18–40 Vdc @ 200 mA sink
Analog Inputs................................................................4–20 mA @ 243Wor 1-5 Vdc @ 10kW
Local Operating Network..............................................Echelon®LonWorksTMTechnology, Standard Protocol, 1.25 MBPS
Calibration and Diagnostics Port ..................................RS422
CCOOMMPPLLIIAANNCCEE
UL/cUL............................................................................Listed