Introduction
BE1-BPR Breaker Protection Relays are three-phase and neutral,
microprocessor based relays designed to provide power systems
with protection and security against monitored breaker failure or
to initiate multiple shot breaker reclosings.
These relays incorporate a powerful means of programming internal
relay logic to satisfy a wide range of user requirements without making
any relay hardware changes. Microprocessor-based design provides
the basic features of a programmable logic controller (PLC) combined
with an instantaneous overcurrent module.
Cased in a 19 inch rack-mount or a vertical panel mount, the relay offers
installation versatility. A wide temperature, 2 lines by 16 character display
provides diagnostic and setup information. Two RS-232 serial ports (one
each front and rear) and one RS-485 serial port (rear) provide remote
communication and relay control.

Built-in diagnostics and monitoring features provide information for both
the health of the relay and the health of the breaker being monitored.
Relay diagnostics include continuous background monitoring of the
power supplies, analog-to-digital (A/D) converter, random-access memory
(RAM), read-only memory (ROM), and electrically-erasable programmable
ROM (EEPROM). A dedicated alarm (ALM) relay output provides power
supply, microprocessor, and software alarm status. Breaker diagnostics
include a timing diagnostic log, breaker contact duty monitoring, breaker
resistor protection, and breaker arc detection.
Other monitoring features include oscillographic fault records and fault
summary logs. BE1-BPR relays use the Inter-Range Instrumentation Group
(IRIG), Format B for high timing accuracy and resolution.
Application - Standard Models
Breaker Failure
BE1-BPR relays are intended to provide a preprogrammed solution for most
breaker failure relaying applications. Breaker failure relaying is the use of a
current monitoring relay to determine whether or not current continues to
flow into a faulted circuit after a breaker has been instructed to interrupt the
circuit. If current continues to flow into the faulted circuit after a defined
period of time has elapsed (sufficient for the breaker to have interrupted the
current), the circuit breaker is considered to have failed. Steps must then be
taken to trip the next set of breakers in the power system to prevent system
damage. Breaker failure schemes must be designed to isolate both the faulted
circuit and the failed breaker.
Several reasons why a breaker fails to clear a fault are:
• Trip circuit is open (broken wire, blown fuse, open trip coil).
• Interrupting mechanism stuck, leaving a single phase of a three-phase circuit
connected.
• Interrupter flash-over due to the loss of dielectric strength through
contamination or damage.
• Operating mechanism failed to operate.
Breaker failure relays detect these conditions and initiate backup procedures.
Breaker failure relays are applied on a per breaker basis. That is, one breaker
failure relay for each breaker in the substation. BE1-BPR relay outputs must be
arranged to initiate the tripping of all the circuit breakers necessary to isolate
the fault if the protected circuit breaker fails to operate. The relay may also
need to initiate transfer tripping of remote breakers to accomplish this task.
Transfer tripping of the remote line end for a breaker failure should also block
reclosing of the remote circuit breakers. External lockout relays are typically
used to trip and block reclosing of the backup breakers because they normally
require a positive operator action to reset them.
Typically, breaker failure protection is applied to transmission and sub-transmission
systems. However, breaker failure protection may be applied to any portion of the
power system where failure of a circuit breaker to operate properly could result in
severe system damage or instability. Breaker failure protection can also be used to
selectively clear a failed breaker in a station with multiple buses without clearing
the entire station.
Breaker Reclosing
BE1-BPR relays can be configured as multiple shot reclosing relays that operate in
parallel and independently from the breaker failure function.
Three major factors should be considered when establishing a reclosing philosophy.
• Desired number or reclosure attempts.
• Time delay between breaker opening and reclosure.
• Supervisory control.
The first major factor is the desired number of reclosure attempts. Where most
faults are attributable to heavy tree exposure, as in distribution networks, multiple
reclosure attempts are common. This is possible because of low voltage levels and
is desirable considering customer inconvenience during outages. BE1-BPR relays
are programmable for up to three reclosure attempts per sequence. This allows
tailoring of the reclosing sequence to the specific needs of the circuit.
The second major factor is the time delay between breaker opening and reclosure.
On sub-transmission and distribution networks, it is necessary to ensure that motors
are no longer running and that local generation is off-line prior to attempting reclosure.
At the same time, a rapid reclosure minimizes damage, ionization, and system shock
in transmission networks. After the first reclosure attempt, additional attempts are
generally delayed to allow for de-ionization of the interrupter. BE1-BPR relays have
three reclosing shots and each shot has a programmable time delay.
Three outputs are available. They are CLOSE, RECLOSE FAIL, and LOCKOUT.
A third major factor to be considered in reclosing is supervisory control. Supervisory
control allows the operator to maintain control of the system at all times. BE1-BPR
relays have two supervisory inputs (WAIT and LOCKOUT). WAIT stops the reclose
sequence at any point and allows the sequence to continue when the WAIT input is
removed. LOCKOUT drives the reclose function immediately to lockout status and
takes precedence over all other inputs.